Our complete track record across engineering, fabrication, construction, installation, maintenance and offshore services.
94Project records
2013–2030Portfolio timeline
Showing 12 of 94 matching records
| No. | Client & Project | Value (RM) | Manhours | Year |
|---|---|---|---|---|
| 01 | Pioneer Engineering Sdn BhdEngineering design services for Compact Floatation Unit at East Belumut A Platform | 183,937.00 | 6,120 | 2013 |
| 02 | Pioneer Engineering Sdn BhdOnshore pre-fabrication and offshore modification of PM323 East Belumut A PWFU Project - Structure | 131,547.00 | 4,380 | 2013 |
| 03 | Pioneer Engineering Sdn BhdOnshore pre-fabrication and offshore modification of PM323 East Belumut A PWFU Project - Piping | 214,245.50 | 7,140 | 2013 |
| 04 | SA Fourth Trade Sdn BhdRig 453 - Repair of 4EA Mud Tank | 900,000.00 | 30,600 | 2014 |
| 05 | Carimin Engineering Services Sdn BhdERB West Infill Drilling Project | 483,314.00 | 16,104 | 2014 |
| 06 | SA Fourth Trade Sdn BhdRig 453 - Repair, blasting, painting, MPI and load test of various rig components | 115,000.00 | 3,828 | 2014 |
| 07 | SA Fourth Trade Sdn BhdRig 453 - Repair, blasting, painting, MPI and load test of various equipment | 135,000.00 | 4,500 | 2014 |
| 08 | Carimin Engineering Services Sdn BhdProvision of onshore and offshore Angsi B, PMO | 563,079.00 | 18,768 | 2015 |
| 09 | Inter-Century Sdn BhdReplacement line complete with dismantling and reinstatement of existing 1,100-foot pier pipe | 1,192,000.00 | 39,732 | 2015 |
| 10 | Carimin Engineering Services Sdn BhdAngsi Water Flooding Optimization - Onshore pre-fabrication services | 2,450,000.00 | 81,660 | 2015 |
| 11 | SA Fourth Trade Sdn BhdFabrication of 2 units telescopic riser clamp | 180,200.00 | 6,144 | 2015 |
| 12 | Carimin Engineering Services Sdn BhdProcurement and fabrication for 2 nos. 12-inch FWS riser replacement for CP2 | 400,000.00 | 13,332 | 2015 |